Bitcoin miner colocation in Canada: hosting fees, contracts, and red flags
General information only, not financial advice. Hosting rates below are the rates the named providers published on their own pages, checked 29 October 2026; rates, availability, and terms change, and nothing here predicts mining earnings. Confirm every figure in a written quote before signing.
What will one hosted miner actually cost per month? Ask three Canadian hosts and the answers arrive in three different units: dollars per kilowatt per month, USDT per kilowatt-hour, and a starting-at price in US cents. None of those numbers can be compared as printed. Colocation itself is simple, your own ASIC sits in a third-party facility that supplies power, cooling, networking, security, and maintenance, while you keep ownership and point the machine at your own pool and wallet. The pricing is where the simplicity ends. This guide converts three published offers onto one bill for the same machine, then reads the contract underneath the price.
Three published offers, one miner, one bill
The test machine is a standard Antminer S19: 95 TH/s at 3,250 W, so 3.25 kW of continuous draw. A month of continuous running is 730 hours (8,760 hours a year divided by 12), which makes the machine’s monthly energy use 3.25 × 730 = 2,372.5 kWh. Those two numbers are all the arithmetic this section needs. The offers, as published:
| Provider (Quebec unless noted) | Published rate | One-time fees | Term and minimum | Same S19, one month |
|---|---|---|---|---|
| D-Central (Laval, QC) | $75 CAD per kW per month, all-inclusive | $50 CAD installation per unit | 3-month minimum; typically 2 months prepaid; no minimum number of miners | 3.25 × $75 = $243.75 CAD |
| Bitcoin Miner Hosting Solutions (Quebec) | $0.072–$0.089 USDT per kWh, all-inclusive, depending on miner count and availability | $35 USD racking per miner, per connection | 6 months plus; monthly upfront; minimum 5 miners | 2,372.5 kWh × rate = 170.82–211.15 USDT |
| Bit-RAM (Canada) | From 7 cents USD per kWh, electricity and maintenance included | Not published on the page checked | Monthly, quarterly, annual, and long-term contracts offered | 2,372.5 kWh × $0.07 = from $166.08 USD, a floor, not a quote |
Read the last column carefully, because it is not a ranking. The three figures sit in three different currencies, and no conversion is applied here: what a USDT or USD figure costs in Canadian dollars depends on the rate on the day you pay, and a comparison that quietly converts at a favourable rate is manufacturing a winner. What the table does settle is structure. A per-kW monthly rate makes the bill independent of how many hours the machine actually runs. A per-kWh rate makes the bill follow metered consumption, and makes the exact rate inside a published range, and what “all-inclusive” covers, worth real money. A starting-at rate settles nothing until a written quote replaces it. One more reference point: D-Central’s own provider guide puts typical Canadian all-inclusive colocation at $0.06–$0.10 per kWh depending on location, contract length, and included services. An offer far below that band is not automatically a bargain; it is a prompt to ask what has been left out.
Fees outside the rate matter at this scale. On the S19 example, the published one-time charges, $50 CAD installation at one host, $35 USD racking at another, equal roughly a fifth to a quarter of one month’s hosting. Prepayment matters too: a contract that takes two months upfront, as D-Central’s terms describe as typical, doubles the cash committed before the first share is submitted. And scale gates differ: one host above takes a single miner, the other requires five, which for a one-machine operator decides the question before price does.
The clause underneath the contract: curtailment
A Quebec hosting contract sits on top of a power arrangement, and in Quebec that arrangement has a specific shape. Hydro-Québec’s official blockchain page states the terms for new cryptographic-use projects of 50 kW or more: energy at the Rate CB price of 18.078¢/kWh applied to all consumption, service provided on a non-firm basis, and the customer carrying the full cost of the connection work. Non-firm is not a detail. Hydro-Québec may curtail a contract’s real power demand to 5% of its highest value recorded in the previous 12 months, on two hours’ notice, for up to 300 hours per rate year.
Three hundred hours is about 3.4% of a year, small as a percentage, concentrated in the winter peaks when it happens. A large facility buying power under those conditions may pass curtailment through to hosting clients, price it into the rate, or absorb it; all three are legitimate, and they are not equivalent for the client. Hosting marketing tends to compress this into a reassuring phrase about occasional winter load shedding with advance communication. The contract questions are more specific: Are curtailment hours passed through to your machines? With what notice, the two hours the utility gives, or better? Is a curtailed hour billed, credited, or silent in the agreement? A host that buys non-firm power and promises firm uptime without explaining the gap is asking you to carry a risk it has not priced in front of you. Note also what the published uptime figures do and do not say: a 95%+ uptime guarantee, as one host above publishes, still leaves room for roughly 36 hours of downtime a month inside the guarantee.
What a sound contract specifies
Four clauses do most of the protective work, and each can be checked as a yes-or-no question before anything ships:
- Your serial numbers, in writing. A hosted miner should be documented down to its serial number, in a form you can verify independently, not only on the host’s own paperwork. No serial inventory, no shipment.
- Your pool, your wallet, verified by you. The defining test of colocation against cloud schemes: the machine hashes to a pool account you control, so its work is visible on a third-party pool page the host does not operate. A provider that requires mining to its wallet, even temporarily, fails the test outright.
- An SLA with numbers. A written service level that states the uptime figure, how it is measured, per machine or averaged across the site, and what compensation follows a miss. Compensation limited to a hosting-fee credit, or an SLA that exists only in sales copy, tells you what the promise is worth.
- A return process with dates. The clause most often missing. Sound wording specifies the return timeline after notice, an independent eight-point hosting check uses 7–14 days as the example of specific, the condition the equipment is returned in, who pays decommissioning and shipping, and what happens for each day of delay. “Within a reasonable timeframe,” or no return terms at all, is the recognised warning form of this clause.
Insurance belongs on the same checklist: ask for documents showing client equipment is insured, not an assurance that it is. One Quebec host above states plainly that it offers insurance against theft, water, and fire damage; whichever host you choose, the equivalent commitment should exist in the contract, with your machines named as covered property.
Red flags that end the conversation
Some findings do not get negotiated. They end the evaluation:
- A guaranteed return. Any fixed percentage, any “risk-free” framing. Difficulty, hashprice, and energy cost all move independently of the operator, so a return that does not move is not a mining return. Real operators talk about power cost, uptime, and efficiency, the variables they actually control.
- No per-kWh rate. Electricity is the dominant cost in mining. A bundle that will not separate the power rate from the service fee is hiding the one number comparison depends on.
- You cannot visit. A facility that refuses a scheduled visit, both Quebec hosts above describe visits by appointment, is asking for trust it will not let you check.
- Customs and shipping surprises. Even legitimate cross-border shipping carries costs the rate excludes: one host notes shipments from outside Canada attract customs duties of about 6.5%, payable by the shipper. Any new fee that appears after signing, release, insurance, diagnostic, gets verified independently before it gets paid.
- Downtime with no remedy. Machines fail at hosts as they do at home. The acceptable version, seen in the terms above, is onsite replacement of routine parts and a stated credit when a machine sits offline and unbootable for an extended period. Silence on both points is its own answer.
The sign-or-walk-away check
Run it in order, on paper, before a miner leaves your hands:
- Convert every quote onto one machine and one month, in its own currency. Refuse to rank across currencies without the payment-day rate.
- Get the exact per-kWh or per-kW figure for your miner count in a written quote, not a range, not a starting-at price.
- Ask how curtailment and load shedding pass through: notice period, billing treatment, and the uptime figure’s measurement basis.
- Confirm the four clauses: serial inventory, your pool and wallet, a numbered SLA, and a dated return process.
- Add the one-time fees and prepayment to the first month’s real cost, and the exit shipping to the last.
What success looks like: a written quote whose monthly figure you can reproduce from the rate and your machine’s nameplate draw, a contract that answers the curtailment and return questions with numbers and dates, and a pool page you control showing your serial-numbered machine hashing. Anything less is a price without a contract behind it, and in colocation, the contract is the product.
, Dex Carter, Tech Writer